What i want to do is this...
I have a content type (A) with two date fields (date_1 and date_2) Then i have two more content types with existent date_1 field created. (Must be this way)
Schema: A: date_1 and date_2 B: date_1 C: date_1
An existing rule creates (every time a new node of content type A is created) a new content node of type B, copying the A:date_1 value to the B:date_1 value. That was easy... and it works just perfect.
Now, what i want to do is the (almost the) same with the content type C. Except for the source field to be copied, that should be date_2
The rule should be something like this: "Every time a node of content Type A is created: Create a new node of content type C and copy the date_2 value from node A, then paste it into the new entity field date_1...
Almost the same, except that when i want to select the source field, date_2 is not listed and i cant select him.
Is there any way to solve this?
Thanks a lot