As in question. I have multivalued taxonomy field. Is this possible to control terms weight, which are belongs to specific node field?
As a term weight, I mean weight inside single node. It's just a field value delta.
Drupal Answers is a question and answer site for Drupal developers and administrators. It only takes a minute to sign up.
Sign up to join this communityAs in question. I have multivalued taxonomy field. Is this possible to control terms weight, which are belongs to specific node field?
As a term weight, I mean weight inside single node. It's just a field value delta.
I found one way to do this. We need to change the taxonomy field widget to autocomplete. Then you can swap the words there, thus changing the delta.